Austrian full-service provider eww Anlagentechnik and ABB have supplied Austria’s national postal service, Österreichische Post, with 2,000 AC-charging stations to electrify its fleet and support the expansion of sustainable parcel delivery throughout the Alpine republic.
Professional workshop staff need professional tools, so ZF Aftermarket has introduced an assembly tool kit for shock absorber replacement to its range of special tools. This allows shock absorbers with piston rod journals to be mounted correctly without damaging the piston rod.
CAREL will be taking part in the Data Centre World Virtual Show, to be held online on 7 and 8 July as a digital preview of the future exhibition scheduled for March 2022 in London. Energy saving will be the star at CAREL’s virtual stand, exhibiting products for data centres, supported by IoT services for a complete system offering based on high-efficiency technologies. CAREL’s goal is in fact to provide its extensive years of experience and specific knowledge in data centre applications to maximise the benefits offered by complete solutions.
ABB’s Azipod® propulsion will help Global Mercy enter less accessible harbors off the African coast, while reducing vibrations and noise – crucial to the comfort of up to 200 patients and medical personnel on board.
The Ingelfingen-based valve specialist GEMÜ has further development his world’s first single-use diaphragm valve GEMÜ SUMONDO. It now enables even faster and more efficient maintenance of single-use systems.
In line with the planned schedule, GE Renewable Energy’s last unit of the Wudongde (WDD) hydropower station has now been successfully connected to the grid for power generation and has completed 72 hours of trial operation.
HMS Industrial Networks AB, a wholly owned subsidiary of HMS Networks AB (publ), has on July 1st, 2021 acquired 60% of all shares in the Spanish company Owasys Advanced Wireless Devices S.L. Headquartered in Bilbao with 20 employees, Owasys is a wireless communication company designing and manufacturing products for utility vehicles and industrial machines.
The New Connected Build Solution Optimizes Project Efficiency and Improves Sustainability Outcomes for Capital Projects Across the Power, Energy, Chemicals and Mining Industries.